Description
Environmental assessment registry documents pertaining to the proposed Special Areas Water Supply project. The Special Areas Water Supply Project is a multi-purpose water supply project that would divert water from the Red Deer River to a large area in east-central Alberta, including the Special Areas. The proposed project consists of a pump station and pipeline to divert water from the Red Deer River southwest of Stettler through a 97.5 kilometre pipeline to a storage reservoir at the headwaters of Sounding and Berry creeks at the north western boundary of the Special Areas. Water would be distributed within the Sounding and Berry Creek basins through existing streams, improved natural channels, and canals. A number of multi-purpose reservoirs would store and release water throughout the system. For more information on the environmental assessment process visit ea.alberta.ca.
Updated
June 12, 2018
Tags
Resources
-
EIA Required Letter (February 4, 2011)
More information DownloadDownloads: 139
-
Project Description (December 2017)
More information DownloadDownloads: 229
-
Map (January 9, 2018)
More information DownloadDownloads: 155
-
Proposed Terms of Reference (December 15, 2017)
More information DownloadDownloads: 75
-
PTOR Notice (January 9, 2018)
More information DownloadDownloads: 55
-
Public Comments on PTOR - 7 (March 1, 2018)
More information DownloadDownloads: 60
-
Final Terms of Reference (March 22, 2018)
More information DownloadDownloads: 128
-
FTOR Notice (June 2018)
More information DownloadDownloads: 99
Title and publication information
Type
Frequency
Irregular
Publisher / Creator Information
Subject Information
Topic
Spatial Coverage
County of Stettler; County of Paintearth; Special Areas 2, 3 and 4
Spatial Coverage
Spatial Coverage
Resource Dates
Date Created
2011-02-04
Date Added
2019-01-25T19:06:07.588265
Date Modified
2018-06-12
Date Issued
2011-02-04
Audience information
Language
Identifiers
Usage / Licence
Usage Considerations
Responsible Director: Alberta Environment and Parks; Project Stage: The final terms of reference were issued for this project on March 22, 2018. Awaiting submission of the EIA/Application.
Licence
Contact
Contact Name
Environmental Assessment Program
Contact Email
Contact Other
Phone 780-427-5828 (toll free dial 310-0000)