Open Government Program

All Resources

Search a listing of Government of Alberta open datasets and publications. Can’t find what you are looking for? Suggest a resource.

20 results

Tags: provincial highways Formats: PDF

Views: 472
Updated

June 22, 2023

Description

Permit application and installation procedures for oil and gas pipelines within the permit area of provincial highways and roads under the direction, control and management of the Minister of...


Views: 2008
Updated

March 31, 2023

Description

The purpose of this document is to supply supplemental guidelines to the Alberta Highway Geometric Design Guide 1999 edition for the urban portions of the provincial highway network. This document...


Views: 716
Updated

December 1, 2021

Description

The construction and operation of a solar power plant within the highway control zone requires a permit from Alberta Transportation. For a solar power plant with a total capacity of 1 MW or...


Views: 1
Updated

October 1, 2020

Description

Often a new or upgraded access to a highway requires accommodating subdivisions or development approvals from local municipalities. This document provides technical guidance regarding design or...


Views: 885
Updated

September 1, 2018

Description

The purpose of design exceptions is to allow for deviations from normal design standards or practices to be made in a thoughtful and consistent way where warranted by the project specific...


Views: 346
Updated

July 17, 2018

Description

For dragline or direct-flow manure application systems to reach fields, hoses often have to run in or along a road ditch (right of way) or through existing (or new) culverts to cross roads. To use...


Views: 1321
Updated

January 1, 2018

Description

Alberta Transportation has recognized the late merge (zipper merge) as an effective traffic accommodation strategy for work zones when applied appropriately for the highway conditions. This...


Views: 348
Updated

September 7, 2017

Description

This bulletin is issued to inform practitioners and department staff that Alberta Transportation adopts energy-efficient light emitting diode (LED) luminaires for use on all new lighting systems...


Views: 341
Updated

April 15, 2016

Description

Presents a tentative three-year provincial construction and rehabilitation program, listing the major projects where substantive work is anticipated to be complete or undertaken during the...