The construction and operation of a solar power plant within the highway control zone requires a permit from Alberta Transportation. For a solar power plant with a total capacity of 1 MW or greater, the applicant is required to submit a solar glare assessment report for review and approval. This guideline sets out the requirements for a solar glare assessment report.