Description
This paper describes the safety and operational impacts of the median high tension cable barrier (HTCB) on Highway 2 between Calgary and Edmonton. A total of 135 km of HTCB was installed within the median of Highway 2 between April and July of 2010. A before and after study of collision data for a total of 10 years (2005 to 2009 and 2011 to2015) was conducted to review and analyze the performance of HTCB in terms of collision rate, collision severity, societal costs, and location of HTCB within the median.
Updated
April 1, 2018
Tags
Title and publication information
Type
Alternative Title
Safety and cost-effectiveness evaluation of the median High Tension Cable Barrier (HTCB) on Highway 2 between Calgary and Edmonton
Alternative Title
Highway 2 (Airdrie to Red Deer, and Leduc area) High Tension Cable Barrier installed in 2010
Extent
57 pages
Frequency
Once
Publisher / Creator Information
Creator
Publisher
Transportation
Contributor
Contributor
Contributor
Contributor
Contributor
Contributor
Subject Information
Topic
Resource Dates
Date Created
2018-04-01
Date Added
2019-01-24T16:15:46.183570
Date Modified
2018-04-01
Date Issued
2018-04-01