Description
This functional planning study was undertaken to review previous plans for northeast Anthony Henday Drive and Highway 16 and update them to include changes in standards and updated population projections. Study of anticipated population growth, projection of anticipated future traffic volumes, and definition of resulting highway right-of-way was deemed necessary. Another important component of the study included a significant effort on structural drawings for many of the bridges in the study area.
Updated
January 1, 2010
Tags
Resources
-
Northeast Edmonton ring road functional planning study : final report
Downloads: 133
-
Appendix A: Geotechnical investigation
Downloads: 38
-
Appendix B: Traffic Noise Assessment
Downloads: 3
-
Appendix C: Report on Planning Stage Road Safety Audit : Northeast Edmonton Ring Road : Stage 1-2041 : 1.6 million regional population
Downloads: 8
-
Appendix E: Northeast Leg - Anthony Henday Drive Environmental Assessment final report
Downloads: 28
-
Appendix F: Limited Phase 1 Environment Site Assessment
Downloads: 11
-
Appendix G: 30 Year (2041 - Stage 1) Functional Plan
Downloads: 19
-
Appendix H - Traffic Analysis
Downloads: 16
-
Appendix A: Functional Planning Study Stormwater Management Plan
Downloads: 14
-
Bridge Planning Summary Report (March 2010)
Downloads: 11
Title and publication information
Type
Alternative Title
Report for Alberta Transportation (Report R-1084)
Alternative Title
Northeast Edmonton Ring Road - Functional Planning Study
Alternative Title
Northeast Edmonton ring road functional planning study manning drive to whitemud drive
Frequency
Once
Publisher / Creator Information
Subject Information
Topic
Resource Dates
Date Created
2010-01-01
Date Added
2019-02-06T22:23:22.779697
Date Modified
2010-01-01
Date Issued
2010-01-01