Description
These best practices have been developed by the Geotechnical and Materials Services Section and have been identified as key geotechnical procedures to be followed on Alberta Transportation projects.
Updated
January 1, 2014
Tags
Resources
-
Geotechnical borehole abandonment
Downloads: 93
-
Guideline for installation of pneumatic piezometers (PP)
Downloads: 35
-
Guideline for installation of slope inclinometer (SI)
Downloads: 44
-
Guideline for installation of standpipe well (SW) and standpipe piezometer (SP)
Downloads: 47
-
Rockfall hazards protection
Downloads: 35
-
Rockfall remediation
Downloads: 25
Title and publication information
Type
Series Title
Frequency
Once
Publisher / Creator Information
Creator
Publisher
Transportation
Subject Information
Topic
Resource Dates
Date Created
2014-01-01
Date Added
2021-01-13T20:58:40.737937
Date Modified
2014-01-01
Date Issued
2014-01-01