This study delineates the flood hazard areas and determines design flood levels along an approximately 26 km reach of the Peace River through Fort Vermilion. The design discharge for the Peace River is 12640 m³/s. The study was prepared in July 2000. Flood information available after study completion may not be reflected in the current flood hazard study report or flood hazard mapping.

Updated

July 1, 2000

Tags
Flood Damage Reduction Program Flood Hazard Identification Program Hamlet of Fort Vermilion Mackenzie County Peace River flood fringes flood hazard mapping flood hazard studies flood hazards floodplains floods floodways
Resources

Title and publication information

Type
Report
Alternative Title

Peace River at Fort Vermilion flood risk mapping study

Alternative Title

Flood risk mapping study Peace River at Fort Vermilion

Extent

38 pages

Frequency

Once

Publisher / Creator Information

Publisher

Environment (1971-1992, 1999-2011)

Place of Publication

Edmonton

Resource Dates

Date Created

2000-07-01

Date Added

2017-02-28T15:57:57.001271

Date Modified

2000-07-01

Date Issued

2000-07-01

Audience information

Identifiers

NEOS catalogue key

2671157

Usage / Licence

Usage Considerations

The study was prepared in July 2000. Flood information available after study completion may not be reflected in the current flood hazard study report or flood hazard mapping.