Description
Environmental assessment registry documents pertaining to the proposed Maxim Power Corp. HR Milner Expansion Project. The proposal is to develop a single unit, 500 MW coal-fired power plant at the site of the existing 150 MW HR Milner Generating Station near Grand Cache, Alberta. The EIA was deemed complete in 2010. For more information on the environmental assessment process visit ea.alberta.ca.
Updated
November 2, 2010
Tags
Resources
-
EIA required letter
Downloads: 25
-
Public disclosure document
Downloads: 21
-
Proposed terms of reference
Downloads: 11
-
Proposed terms of reference public notice
Downloads: 6
-
Final Terms of Reference (2008-04-09)
Downloads: 10
-
Final Terms of Reference public notice
Downloads: 5
-
Public Notice : notice of applications
Downloads: 10
-
EIA Complete Letter (2010-11-24)
Downloads: 23
Title and publication information
Type
Frequency
Irregular
Publisher / Creator Information
Subject Information
Topic
Spatial Coverage
Spatial Coverage
Subject (LCSH)
Environmental impact analysis--Alberta--Grande Cache Region.
Subject (LCSH)
Resource Dates
Date Created
2007-09-25
Date Added
2016-06-17T17:25:59.902076
Date Modified
2010-11-02
Date Issued
2007-09-25
Audience information
Language
Identifiers
NEOS catalogue key
4402377
Local Identifier
EPEA Appl # 012-00009814 ; AUC Appl # 1604766
Usage / Licence
Usage Considerations
The information included in this record is what is currently available in electronic format.
Contact
Contact Name
Environmental Assessment Program
Contact Email
Contact Other
phone 310-3773