Description
Environmental assessment registry documents pertaining to a proposed expansion to the Imperial Oil Resources Limited Cold Lake project. The project proposes expanding the existing Cold Lake operations targeting bitumen resources in the Grand Rapids Formation using a solvent-assisted steam-assisted gravity drainage recovery process. Bitumen production capacity would be up to 55,000 barrels per day.
Updated
March 6, 2017
Tags
Resources
-
EIA required letter (April 22, 2015)
Downloads: 96
-
Project summary table and map (April 20, 2015)
Downloads: 164
-
Proposed terms of reference (July 24, 2015)
Downloads: 51
-
PTOR notice (July 2015)
Downloads: 24
-
Public Comments on PTOR - 4 (December 2015)
Downloads: 42
-
Final Terms of Reference (December 14, 2015)
Downloads: 62
-
FTOR Notice (December 2015)
Downloads: 22
-
Public Notice (March 21, 2016)
Downloads: 48
-
EIA Complete Letter (March 6, 2017)
Downloads: 129
Title and publication information
Type
Frequency
Once
Publisher / Creator Information
Subject Information
Topic
Resource Dates
Date Created
2015-04-22
Date Added
2018-10-09T19:55:21.246655
Date Modified
2017-03-06
Date Issued
2015-04-22
Audience information
Language
Identifiers
Local Identifier
EPEA Appl#: 013-00073534 ; OSCA Appl#: 1854138
Usage / Licence
Usage Considerations
The information included in this record is what is currently available in electronic format.
Licence
Contact
Contact Name
Environmental Assessment Program
Contact Email
Contact Other
phone 310-3773