Description
Under Alberta’s Environmental Protection and Enhancement Act, borrow excavations developed for road construction must be reclaimed to a land capability equivalent to its pre-disturbance land capability, in order to receive a reclamation certificate for the site. This document presents suggested procedures and criteria to carry out an assessment on reclaimed borrow excavations and their associated haul roads (borrow sites).
Updated
December 1, 2013
Tags
Title and publication information
Type
Alternative Title
Post-disturbance assessment guide for borrow excavations
Extent
33 pages
Frequency
Once
Publisher / Creator Information
Subject Information
Topic
Resource Dates
Date Created
2013-12-01
Date Added
2019-01-25T16:22:42.739291
Date Modified
2013-12-01
Date Issued
2013-12-01
Audience information
Language
Identifiers
Usage / Licence
Usage Considerations
This guide supersedes the document entitled Alberta Transportation Post-Disturbance Assessment procedures for Borrow Excavations for Road Construction. The original document was prepared in May 2002 by EBA Engineering Ltd. This document was amended with input provided by Alberta Environment and Sustainable Resource Development, and Alberta Transportation.