Description
The department currently has a typical drawing CB6-4.3M3, for an un-reinforced Full F-Shape concrete barrier constructed by slip-form. The need for a typical drawing for an un-reinforced Half F-Shape barrier constructed by slip-form has arisen on a recent project. A new typical drawing has been developed by the department and is being issued under this Design Bulletin. The slip-formed Half F-shape concrete barrier shall be used with earth fills as shown on drawing CB6-4.3M3A. The earth fill provides lateral support for the Half F-Shape concrete barrier.
Updated
September 30, 2007
Tags
Resources
-
Slip-formed concrete barrier F-shape (revised September 2007)
More information DownloadDownloads: 269
-
Drawing CB6-4.3.M3 (revision 4) : slip-formed median barrier F-shape (September 14, 2007)
More information DownloadDownloads: 186
-
Drawing CB6-4.3M3A (revision 1) : Slip-formed concrete barrier half F-shape (September 14, 2007)
More information DownloadDownloads: 124
Title and publication information
Type
Series Title
Alternative Title
Design bulletin #23/2004
Extent
1 page
Frequency
Once
Publisher / Creator Information
Subject Information
Topic
Resource Dates
Date Created
2004-09-03
Date Added
2015-11-26T17:39:50.307721
Date Modified
2007-09-30
Date Issued
2004-09-03
Audience information
Language
Identifiers
Local Identifier
23/2004
Usage / Licence
Usage Considerations
The Design Bulletins will be of interest to Engineering Consultants and the Department of Transportation's Construction Contract Administrators. The series contains documents intended to clarify or supplement information contained in the Department's Design Guide, Traffic Control Standards Manual, Engineering Consultant Guidelines for Primary Highway Projects, Standard Specification for Highway Construction or related documents.
Contact
Contact Name
Alberta Transportation. Highway Operations Standards