Description
This guideline has been developed by Alberta Environmental Protection because of the reality that all liners will leak to some extent and because of the resultant history of groundwater contamination at some sites. This guideline focuses on double lined ponds with a primary liner consisting of a geomembrane liner, a secondary liner (normally consisting of a geomembrane liner or a clay liner), and a leak detection/collection system in between the two liners, by ensuring that the liner leakage is minimal and that it is controlled.
Updated
May 1, 1996
Tags
Resources
-
Action leakage rate guideline
Downloads: 913
Title and publication information
Type
Extent
9 pages
Frequency
Once
Publisher / Creator Information
Subject Information
Topic
Subject (LCSH)
Subject (LCSH)
Subject (LCSH)
Resource Dates
Date Created
1996-05-01
Date Added
2018-06-19T19:28:24.124663
Date Modified
1996-05-01
Date Issued
1996-05-01
Audience information
Language
Identifiers
NEOS catalogue key
1772632