Publications

Preliminary compatibility studies of G.C.O.S. sand tailings pond water with Athabasca River

Archived

This item has been replaced by a more recent resource or the content may be otherwise out of date. It is provided for informational and research purposes.
Description

GCOS requested permission to discharge effluent from the sands tailings pond at the Fort McMurray site into the Athabasca River during periods of high river flow. GCOS outlined the events which made this request necessary in order that an adequate base be developed for a stable 200 foot dike.

Updated

June 21, 1968

Tags
Environmental health Tailing ponds effluent environmental monitoring

Title and publication information

Type
Report
Extent

19 pages

Frequency

Once

Publisher / Creator Information

Creator
Health
Publisher

Health

Place of Publication

Edmonton

Resource Dates

Date Created

1968-06-21

Date Added

2015-07-16T21:42:32.522107

Date Modified

1968-06-21

Date Issued

1968-06-21

Date Archived

2015-06-01

Audience information

Identifiers

NEOS catalogue key

1547544

Usage / Licence

Contact

Contact Name

Environment and Sustainable Resource Development