Open Government Program

All Resources

Search a listing of Government of Alberta open datasets and publications. Can’t find what you are looking for? Suggest a resource.

9 results found for: "Stantec Consulting Ltd."

Views: 674
Updated

June 2, 2020

Description

This resource was developed to assist agencies and professionals needing to manage risks related to property or materials contaminated with fentanyl. Procedures for the assessment and remediation of property or materials contaminated with fentanyl are outlined. These will be most applicable in...


Views: 790
Updated

January 31, 2020

Description

This protocol document outlines the survey requirements of the renewable energy industry once a new project has been built and is operational. It provides the direction for the requirements that are outlined in the Wildlife Directive for Alberta Wind Energy Projects and the Wildlife Directive for...


Views: 576
Updated

August 21, 2019

Description

This functional planning study considered requirements for the upgrading and twinning of a section of Highway 3 from the Town of Taber to west of the Hamlet of Burdett. The purpose of this study is to identify staged options to upgrade the highway to a twinned freeway corridor and identify future...


Views: 55
Updated

December 31, 2017

Description

In 2014, Stantec Consulting Ltd. carried out an in depth survey of the Highwood River valley for archaeological, historic, and palaeontological resources. In addition to revisiting known sites and recording new ones, the project provided risk assessments relative to flood related impacts and site...


Views: 40
Updated

October 25, 2013

Description

Technical report prepared for the Community Flood Mitigation Advisory Panel and describing proposed flood mitigation measures for the Elbow River, Sheep River and Highwood River basins. The report presents the design basis, conceptual details and opinions of probable costs for the proposed flood...


Views: 89
Updated

January 1, 2010

Description

An assessment and analysis of high-voltage electric power transmission systems was conducted for the Alberta Department of Energy by Stantec Consulting Ltd., with assistance from AREVA T&D, Power Delivery Consultants, ABB, and Siemens AG Energy Sector. The study was intended to provide...


Views: 465
Updated

March 1, 2005

Description

Guidelines to assist qualified engineers in completing a traffic impact assessment report on behalf of a developer or municipality.


Views: 11
Updated

May 1, 2004

Description

Summary of concerns raised by private landfill operators about the competitive advantages held by regional and municipal operators when partnering with private operators for handling of waste.


Views: 71
Updated

September 1, 2003

Description

Two TransAlta Utilities Corporation power generating plants are located on the shores of Wabamun Lake. The plants use a local supply of coal which is strip mined within the watershed. The Wabamun Power Plant is located on the north shore near the village of Wabamun and the Sundance Power Plant on...