All Resources
Search a listing of Government of Alberta open datasets and publications.
Views: 357
Updated
June 1, 2020
Description
A report summarizing the activities of the Bow River Phosphorus Management Plan Implementation Committee from 2014 to 2019.
Tags
Views: 273
Updated
December 31, 2017
Description
Presents the findings of a study of the the private artifact collection, EdPl-40 (the Ramsfield collection), during the 2014 post-flood impact assessment of the Highwood River. The Ramsfield...
Tags
Views: 274
Updated
December 31, 2017
Description
Historic resources assessments of the impacts the 2013 flood on palaeontological and archaeological resources adjacent to the Bow, Sheep, and upper Highwood rivers in southern Alberta were...
Tags
Views: 314
Updated
December 31, 2017
Description
In 2014, Stantec Consulting Ltd. carried out an in depth survey of the Highwood River valley for archaeological, historic, and palaeontological resources. In addition to revisiting known sites and...
Tags
Views: 351
Updated
December 31, 2017
Description
In 2016, preliminary excavations were conducted at EdPm-7 and EePl-261 along the Highwood River south of Calgary. The sites were heavily impacted by the 2013 floods and continue to be threatened...
Tags
Views: 251
Updated
December 31, 2017
Description
Assessment excavations were completed in the fall of 2016 at the Spitzee Post (EdPl-13) and the Metke Site (EdPl-10). Recognizing the value of historic resources along these drainages, these...
Tags
Views: 181
Updated
January 1, 2016
Description
Periodic flood events are normal for rivers. These events sometimes deposit sediments that trap biological remains that can be used to reconstruct the local environment. Following the 2013...
Tags
Views: 475
Updated
June 1, 2014
Description
The purpose of this study was to evaluate the feasibility of various mitigation projects, and combine the most feasible projects into water management plans for the Sheep River and Highwood River...
Tags
Views: 400
Updated
October 25, 2013
Description
Technical report prepared for the Community Flood Mitigation Advisory Panel and describing proposed flood mitigation measures for the Elbow River, Sheep River and Highwood River basins. The...
Tags
Views: 166
Updated
September 1, 2001
Description
This report is a comparative assessment of three potential reservoir sites in the Highwood River basin. It has been prepared to address Condition 5 of Natural Resources Conservation Board Order No. 9601-1.