Open Government Program

All Resources

Search a listing of Government of Alberta open datasets and publications.

5 results

Organizations: Transportation Tags: High Tension Cable Barrier

Views: 1
Updated

April 1, 2018

Description

This paper describes the safety and operational impacts of the median high tension cable barrier (HTCB) on Highway 2 between Calgary and Edmonton. A total of 135 km of HTCB was installed within...


Views: 967
Updated

February 7, 2017

Description

This information sheet looks at the use of high tension cable barriers as a means of reducing the severity of a collision for vehicles in run-off-road crashes, and discusses whether cable barriers...


Views: 828
Updated

October 10, 2013

Description

The purpose of this study was to evaluate the operational, safety, and economic performance of the high tension cable barrier system installed in the median of Highway 2, between Airdrie and Red...


Views: 636
Updated

February 15, 2011

Description

Compares shoulder and ditch installations of high tension cable barrier (HTCB) on Highway 2 and sets out the rationale and advantages of locating HTCB at the shoulder (adjacent to the pavement)...


Views: 192
Updated

February 15, 2011

Description

This technical memo provides advice to Alberta Transportation on whether there is any advantages in safety and operations that might result in the relocation of high tension median cable barriers...