Open Government Program

All Resources

Search a listing of Government of Alberta open datasets and publications. Can’t find what you are looking for? Suggest a resource.

34 results

Organizations: Energy Topics: Science, Technology and Innovation

Views: 484
Updated

July 21, 2021

Description

Reports on a cyclic solvent process (CSP) experimental pilot project at Cold Lake in the Clearwater formation. CSP is a non-thermal, in-situ bitumen recovery process that utilizes injected solvent...


Views: 313
Updated

February 1, 2019

Description

This pilot project was conducted in the Panny area within the Peace River Oil Sands Area. The intent of the project was to evaluate the potential of a low-pressure process that utilizes downhole...


Views: 339
Updated

July 31, 2017

Description

The purpose of Cenovus’ AIDROH (Air Injection and Displacement for Recovery from Oil Horizontal) project is to explore the viability of using horizontal wells to recover bitumen in the Kirby...


Views: 1152
Updated

July 8, 2015

Description

Reports on a solvent-assisted steam assisted gravity drainage (SA -SAGD) experimental pilot scheme at Cold Lake in the Clearwater formation conducted by Imperial Oil. The experimental process...


Views: 391
Updated

January 26, 2015

Description

Reports on an associated polymer flood pilot conducted at the East Bodo Upper Mannville “A” pool sandstone heavy oil reservoir. The pilot pattern consisted of three vertical injectors and six...


Views: 251
Updated

July 10, 2014

Description

Reports on a pilot project in the Athabasca Grosmont Formation to evaluate the commercial potential of thermal recovery within a karsted carbonate reservoir. While steam assisted gravity drainage...


Views: 241
Updated

June 26, 2014

Description

Reports on a project funded by the Innovative Energy Technologies Program to evaluate waterflood performance in low-permeability sandstones with multi-stage fractured horizontal wells. The project...


Views: 256
Updated

January 1, 2014

Description

This project addressed water management challenges in the oil sands open pit mining process through the application of innovative water treatment technologies. New technologies such as ceramic...


Views: 330
Updated

July 12, 2013

Description

The Redwater immiscible CO2 vertical pilot project includes three existing production wells and a new production, injection and observation well. The project also includes dedicated injection and...


Views: 171
Updated

July 1, 2013

Description

Encana’s IETP Round 3 project, Deep Basin Development and Measurement of Marginal Zones, involved a 10-well pilot to evaluate the production performance of marginal zones completed using limited...