All Resources
Search a listing of Government of Alberta open datasets and publications.
Views: 0
Updated
July 1, 2022
Description
Reports on a Carbon Capture and Storage (CCS) project to remove CO2 from the process gas streams of the three hydrogen-manufacturing units which are a part of the Scotford Upgrader infrastructure....
Tags
Views: 0
Updated
March 31, 2022
Description
Contains the 2021 summary and detailed reports from the Alberta Carbon Trunk Line Project. The annual submission is a requirement under the Carbon Capture and Storage Funding Agreement, Knowledge...
Tags
Views: 0
Updated
August 11, 2021
Description
Reports on a Carbon Capture and Storage (CCS) project to remove CO2 from the process gas streams of the three hydrogen-manufacturing units which are a part of the Scotford Upgrader infrastructure....
Tags
Views: 548
Updated
July 21, 2021
Description
Reports on a cyclic solvent process (CSP) experimental pilot project at Cold Lake in the Clearwater formation. CSP is a non-thermal, in-situ bitumen recovery process that utilizes injected solvent...
Tags
Views: 0
Updated
March 31, 2021
Description
Enhance Energy Inc. and North West Redwater Partnership are developing a fully integrated Carbon Capture and Storage project, the Alberta Carbon Trunk Line (ACTL). The project will provide...
Tags
Views: 0
Updated
March 31, 2020
Description
Enhance Energy Inc. and North West Redwater Partnership are developing a fully integrated Carbon Capture and Storage project, the Alberta Carbon Trunk Line (ACTL). The project will provide...
Tags
Views: 0
Updated
March 31, 2020
Description
Reports on a Carbon Capture and Storage (CCS) project to remove CO2 from the process gas streams of the three hydrogen-manufacturing units which are a part of the Scotford Upgrader infrastructure....
Tags
Views: 6465
Updated
March 31, 2019
Description
Reports on a Carbon Capture and Storage (CCS) project to remove CO2 from the process gas streams of the three hydrogen-manufacturing units which are a part of the Scotford Upgrader infrastructure....
Tags
Views: 353
Updated
February 1, 2019
Description
This pilot project was conducted in the Panny area within the Peace River Oil Sands Area. The intent of the project was to evaluate the potential of a low-pressure process that utilizes downhole...
Tags
Views: 465
Updated
November 27, 2018
Description
The concept for this project is to inject EOR (Enhanced Oil Recovery) chemical into a conventional heavy oil reservoir with an active aquifer, to determine if this technology can yield economic...