All Resources
Search a listing of Government of Alberta open datasets and publications.
Views: 527
Updated
March 1, 2016
Description
The Elbow River Dam at McLean Creek site (MC1) was investigated as one of several options considered to mitigate flood risk, considering the devastation that occurred during the June 2013 flood....
Tags
Views: 849
Updated
July 13, 2015
Description
The purpose of this study was to conduct a flood mitigation feasibility study for the areas within the Peace River Basin in Alberta that have historically been flooded and are likely to be...
Tags
Views: 634
Updated
February 9, 2015
Description
The environmental overview of the proposed McLean Creek Dry Dam summarizes the environmental resources and associated land uses that could be affected if this project were to be developed.
Tags
Views: 579
Updated
July 9, 2014
Description
Presents the findings of a study to assess flood mitigation schemes in the Sheep and Highwood river basins and the South Saskatchewan River Sub-Basin provided by the Southern Alberta Flood...
Tags
Views: 593
Updated
June 6, 2014
Description
This study reviews and evaluates flood mitigation proposals for the Sheep and Highwood river basins and the South Saskatchewan River Sub-Basin. It also proposes a water management strategy for...
Tags
Views: 1628
Updated
June 1, 2014
Description
Following the floods of June 2013, the Government of Alberta (GoA) set up the Southern Alberta Flood Recovery Task Force (SAFRTF). In October 2013, AMEC Environment and Infrastructure, a Division...
Tags
Views: 442
Updated
June 1, 2014
Description
The purpose of this study was to evaluate the feasibility of various mitigation projects, and combine the most feasible projects into water management plans for the Sheep River and Highwood River...
Tags
Views: 1122
Updated
May 1, 2014
Description
This report represents the results of a study to identify and assess potential options to mitigate flood risks to people, communities and infrastructure within the Red Deer River Basin. The report...
Tags
Views: 1063
Updated
May 1, 2014
Description
The primary purpose of the feasibility study is to develop a water (floodplain) management plan for the flood-affected areas within the Athabasca Basins based on a benefit/cost analysis of...
Tags
Views: 1018
Updated
March 1, 2014
Description
This study delineates flood hazard areas and determines design flood levels for Blackmud Creek through Nisku. The study area includes a 12 km reach of Blackmud Creek. The design discharge for...