All Resources
Search a listing of Government of Alberta open datasets and publications.
Views: 4728
Updated
October 21, 2020
Description
Flood maps are created by combining hydraulic model results with high-accuracy ground information. Field surveys and LiDAR remote sensing are used to collect river and floodplain elevations,...
Tags
Views: 7130
Updated
June 6, 2016
Description
The NRN product is distributed in the form of thirteen provincial or territorial datasets and consists of two linear entities (Road Segment and Ferry Connection Segment) and three punctual...
Tags
Views: 145
Updated
March 29, 2016
Description
The Cold Lake oil sands area - Township 56 to 69, Range 1 to 11, west of the 4th Meridian, falls within the Lower Athabasca Regional Plan (LARP). As part of Alberta's Land-use Framework, LARP was...
Tags
Views: 162
Updated
March 29, 2016
Description
The Cold Lake oil sands area, Township 56 to 69, Range 1 to 11, west of the 4th Meridian, falls within the Lower Athabasca Regional Plan (LARP). As part of Alberta's Land-use Framework, LARP was...
Tags
Views: 144
Updated
March 29, 2016
Description
In 2014, the Alberta Energy Regulator (AER) initiated a Play-Based Regulation (PBR) pilot project as a step towards implementation of the Unconventional Regulatory Framework. One of the goals of...
Tags
Views: 139
Updated
March 29, 2016
Description
In 2014, the Alberta Energy Regulator (AER) initiated a Play-Based Regulation (PBR) pilot project as a step towards implementation of the Unconventional Regulatory Framework. One of the goals of...
Tags
Views: 177
Updated
March 29, 2016
Description
In 2014 the Alberta Energy Regulator (AER) initiated a Play-Based Regulation (PBR) pilot project as a step towards implementation of the Unconventional Regulatory Framework. One of the goals of...
Tags
Views: 256
Updated
March 29, 2016
Description
The Cold Lake Oil Sands area, Twp. 56 to 69, Rge. 1 to 11, W 4th Mer., falls within the Lower Athabasca Regional Plan (LARP). As part of Alberta's Land-use Framework, LARP was developed in 2012 to...
Tags
Views: 156
Updated
March 29, 2016
Description
In 2014, the Alberta Energy Regulator (AER) initiated a Play-Based Regulation (PBR) pilot project as a step towards implementation of the Unconventional Regulatory Framework. One of the goals of...
Tags
Views: 142
Updated
March 29, 2016
Description
In 2014, the Alberta Energy Regulator (AER) initiated a Play-Based Regulation (PBR) pilot project as a step towards implementation of the Unconventional Regulatory Framework. One of the goals of...