Description
Environmental assessment registry documents pertaining to the proposed Montem Resources Alberta Operations Ltd. Tent Mountain Project. The Project would involve the resumption of mining at a surface coal mine, a coal preparation plant and associated infrastructure including a coal conveyor system and a rail load-out facility. The total project area would be confined to the existing Mine Permit area of 750 hectares and the mine production would average 1.2 million tonnes of metallurgical coal per year. For more information on the environmental assessment process visit ea.alberta.ca.
Updated
July 5, 2021
Tags
Resources
-
EIA Required Letter - Mine (January 8, 2021)
Downloads: 345
-
EIA Required Letter - Mine and Coal Processing Plant (February 2021)
Downloads: 258
-
Project Summary Table (February 2021)
Excerpt from Montem document.
More information DownloadDownloads: 260
-
Map
Downloads: 291
-
Proposed Terms of Reference (February 2021)
Downloads: 335
-
PTOR Notice (February 2021)
Downloads: 273
-
Public Comments on PTOR - 33
Downloads: 31
-
Final Terms of Reference (May 26, 2021)
Downloads: 54
-
FTOR Notice (June 2021)
Downloads: 66
Title and publication information
Type
Frequency
Irregular
Publisher / Creator Information
Subject Information
Topic
Spatial Coverage
Spatial Coverage
Resource Dates
Date Created
2021-02-12
Date Added
2021-02-08T22:12:36.013000
Date Modified
2021-07-05
Date Issued
2021-02-12
Audience information
Language
Identifiers
Usage / Licence
Usage Considerations
Responsible Director: Alberta Energy Regulator; Project Stage: : Final terms of reference were issued for this project on May 26, 2021. Awaiting submission of the EIA/Application.
Licence
Contact
Contact Name
Environmental Assessment Program
Contact Email
Contact Other
Phone 780-427-5828 (toll free 310-0000)