Description
Environmental assessment registry documents pertaining to the proposed Connacher Oil and Gas Limited Great Divide SAGD Expansion Project. Connacher is proposing to expand the productive capacity of its existing facilities by an additional 3,700 m3 of bitumen per day to bring the overall lease production to approximately 7,000 m3/day (44,000 bbl/d) of bitumen. The location of the project is approximately 70 km south of Fort McMurray in the Regional Municipality of Wood Buffalo. The EIA was deemed complete in 2012. For more information on the environmental assessment process visit ea.alberta.ca.
Updated
May 29, 2012
Tags
Resources
-
EIA required letter
Downloads: 27
-
Public disclosure document
Downloads: 9
-
Map
Downloads: 167
-
Summary
Downloads: 34
-
Proposed terms of reference
Downloads: 5
-
PTOR notice
Downloads: 6
-
Public comments
Downloads: 8
-
Final terms of reference (2009-07-17)
Downloads: 9
-
FTOR notice
Downloads: 3
-
Public notice
Downloads: 8
-
EIA complete letter (2012-05-29)
Downloads: 19
-
Letter to proponent
Downloads: 13
Title and publication information
Type
Frequency
Irregular
Publisher / Creator Information
Creator
Publisher
Environment (1971-1992, 1999-2011)
Contributor
Place of Publication
Resource Dates
Date Created
2009-01-30
Date Added
2016-08-09T14:09:28.141352
Date Modified
2012-05-29
Date Issued
2009-01-30
Audience information
Language
Identifiers
Local Identifier
EPEA Appl # 003-00240008; ERCB Appl # 1650859; Water Acct # 271543
Usage / Licence
Usage Considerations
The information included in this record is what is currently available in electronic format.
Contact
Contact Name
Environmental Assessment Program
Contact Email
Contact Other
phone 310-3773