Open Government

All Resources

Search a listing of Government of Alberta open datasets and publications. Can’t find what you are looking for? Suggest a resource.

545 results

Organizations: Environment (1971-1992,1999-2011)

Last Modified

December 30, 2008

Description

This protocol covers the diversion of organic residues from landfill for biological decomposition to a condition sufficiently stable for nuisance-free storage and for safe use in land application.


Last Modified

October 1, 2009

Description

This protocol serves as a generic ‘recipe’ for project proponents to follow in order to meet the measurement, monitoring, and greenhouse gas quantification requirements for reductions resulting from conversion of instrument gas to instrument air in process control systems. A process flow diagram...


Last Modified

February 1, 2017

Description

Listing of violations and enforcements under the Environmental Protection and Enhancement Act for a 3 month period.


Last Modified

February 1, 2006

Description

The purpose of the Provincial Parks Lake Monitoring Program is to routinely collect information that describes the current status of water quality within a suite of recreational lakes and reservoirs. These waterbodies vary considerably in terms of their physical (e.g. size, shape and mean depth),...


Last Modified

January 1, 2000

Description

This edition is a revision of the 2nd approximation of the Range Plant Community Types and Carrying Capacity for the Dry and Central Mixedwood Pub. No. T/395.


Last Modified

May 27, 2016

Description

Residents of the Calder neigbourhood in Edmonton had concerns with diesel fume impacts on the air quality in the area resulting from a Canadian National rail yard located just south of the neighbourhood. Alberta Environment conducted mobile air monitoring surveys in the winter and summer of 2004...


Last Modified

February 7, 2011

Description

Environmental assessment registry documents pertaining to the proposed Silver Birch Energy Corp. (formerly UTS Energy Corporation/Teck Cominco Limited) Equinox Oils Sands Mine. The proposal involves oil sands mining and a bitumen extraction facility with a production capacity between 100-160,000...


Last Modified

October 20, 2008

Description

Environmental assessment registry documents pertaining to the proposed Beaver Hills Processing GP Inc. Condensate Processing Project. Proposal to process approximately 36,500 barrels of condensate and pyrolysis gasoline per day to produce gasoline, diesel, benzene, hydrogen and improved...


Last Modified

April 4, 2011

Description

Environmental assessment registry documents pertaining to the proposed Alter NRG Fox Creek Coal Gasification Project. The proposed project involves the extraction of the coal resource at a rate of approximately 9.2 million tonnes per year and the production of diesel fuel and naphtha, through...


Last Modified

May 1, 1993

Description

This manual was developed to provide a consolidated reference for determining air quality in Alberta. It is the responsibility of the Air Environmental Centre to provide chemical analysis in support of the water and air quality control programs of Alberta Environment.


Last Modified

October 6, 2008

Description

Environmental assessment registry documents pertaining to the proposed Sherritt International Corporation (Carbon Development Partnership) Dodds-Roundhill Coal Gasification Project. The proposal involves a surface coal mine and a goal gasification complex, with associated infrastructure. The...


Last Modified

January 25, 2006

Description

Environmental assessment registry documents pertaining to the proposed Bow City Power Ltd. (formerly Luscar Ltd.) Bow City Power Project. The proposal is for a two unit 1000 megawatt coal fired power plant and associated coal preparation plant in the County of Newell, approximately 25 km...


Last Modified

October 6, 2008

Description

Environmental assessment registry documents pertaining to the proposed Barakat Resources Ltd. Baseline Mountain Underground Limestone Project. The proposal is to construct and operate an underground limestone quarry with an estimated annual production (mining and crushing) of 600,000 tonnes per...


Last Modified

January 1, 2007

Description

The Government of Alberta is committed to taking action on climate change. Beginning with its Climate Change Action Plan - Albertans & Climate Change: Taking Action, released in October 2002, the Government of Alberta identified a number of strategies the province would use to address climate...


Last Modified

January 1, 2005

Description

Reporting of greenhouse gas (GHG) emissions from large industrial sources is a fundamental component of Alberta’s action plan to address climate change. The development of a mandatory GHG reporting program was a commitment identified in Albertans and Climate Change: Taking Action released in...


Last Modified

January 1, 2006

Description

The specified gas reporting program was developed as part of the Government of Alberta's climate change action plan, Albertans and Climate Change: Taking Action, released in October 2002. The Climate Change and Emissions Management Act defines a specified gas as any gas that traps heat near the...


Last Modified

January 1, 2009

Description

In 2002, Alberta signaled its commitment to manage climate change and greenhouse gas emissions in the province by passing the Climate Change and Emissions Management Act. One of the first actions taken under the new legislation was to develop a mandatory reporting program for large industrial...


Last Modified

February 6, 2006

Description

Environmental Impact Assessment and associated applications pertaining to the proposed Total E&P Canada Ltd. (formerly Deer Creek Energy Limited) Joslyn North Mine Project. The oil sands surface mine and bitumen extraction facilities proposes to produce 100,000 barrels per day of bitumen. The...


Last Modified

January 22, 2008

Description

Environmental assessment registry documents pertaining to the proposed Total E&P Canada Ltd. (formerly Deer Creek Energy Limited) Joslyn North Mine Project. The oil sands surface mine and bitumen extraction facilities proposes to produce 100,000 barrels per day of bitumen. The location is...


Last Modified

December 14, 2007

Description

Environmental Impact Assessment and associated applications pertaining to the proposed Total E&P Canada Ltd. Upgrader Project. The proposal involves a 47 200 cubic metres per stream day oil sands bitumen upgrader and consists of two Phases commencing in 2014 and 2018. The location is...